Laboratory construction planning requirements

   Laboratory construction planning requirements

  According to the requirements of the design task, combined with the overall design of the terrain. Before designing, we want to use and functions of the building were analyzed. Laboratory for chemical analysis should normally be arranged on the lower wind direction and the downstream area, maintain a certain distance and good ventilation, there should greenbelt, improve sewage treatment and detoxification, good comprehensive environmental assessment and management.

  For analytical laboratory instruments, generally require a good environment. There are anti-vibration anti-noise requirements of laboratory away from the vibration source and noise source; the shielding requirements of laboratory away from electromagnetic interference source; require ultra-clean high-purity laboratory to plan in less dust, green good location.

  Composition 1.3.2 Laboratory buildings: laboratory building generally divided into four categories according to their use.

  (1) experimental research categories: the core detection experiments to analyze the building, including various types of general laboratory and specialized laboratory and lab, computer room and measurement room.

  (2) Auxiliary Building categories: including Library and Information resource center, room and Dianhuajiaoshi and other academic activities.

  (3) Utilities categories: including water, electricity, gas, oil, refrigeration, air conditioning, cold and heat systems, communications, fire protection, waste treatment, various types of equipment, warehouses and other buildings.

  (4) Administrative and living services: the relationship between the above four categories of building are very close, after three buildings was first class construction services, and have contact with each other between them. The construction planning area allocation is generally: research space by 30% to 69%, research support space of 5% to 31% Utilities 5% to 18% of the buildings, administrative buildings and service life of 10% to 29%.

 